Wastewater Treatment — Vietnam

Environmental Equipment

Challenge: A Vietnamese industrial park required a comprehensive wastewater treatment system meeting stringent local discharge standards. The client had no prior experience sourcing from China and was concerned about quality and installation support.

Solution: We identified three qualified manufacturers, arranged factory visits with video walkthroughs, negotiated a turnkey contract including on-site installation and operator training. Our engineers reviewed all technical drawings and conducted pre-shipment testing.

Result: System delivered on schedule with full compliance. 35% cost savings vs. European alternatives. Ongoing spare parts supply managed through our dedicated service desk.

35%
Cost Savings
4 Mo.
Delivery Time
100%
Compliance

Surgical Instruments — Germany

Medical Devices

Challenge: A German medical distributor needed a reliable OEM partner for stainless steel surgical instruments with CE marking and ISO 13485 certification. Tolerances were tight, and biocompatibility testing was mandatory.

Solution: We identified manufacturers with existing EU regulatory filings and arranged technical audits. Our team managed the entire certification documentation package, including material traceability records and sterilization validation.

Result: Successful CE certification achieved in 4 months. Annual contract of EUR 450,000 with 98.5% on-time delivery rate over two years.

EUR 450K
Annual Value
98.5%
On-Time
CE
Certified

Food Processing Equipment — Brazil

Industrial Machinery

Challenge: A Brazilian food processing company required custom stainless steel conveyor systems meeting ANVISA hygiene standards. The equipment was complex, involving 47 different components from 6 suppliers.

Solution: We consolidated the multi-supplier procurement, handled quality inspections at each factory, managed container consolidation, and coordinated sea freight to Santos port including inland trucking to the client’s facility.

Result: All 47 components delivered in a single consolidated shipment, saving 28% on total logistics cost. Equipment commissioned and operational within 30 days of arrival.

28%
Logistics Saving
6
Suppliers Coordinated
30 Days
To Operation